CONSTRUCTION AREA
—
BUILDING HEIGHT
—
SPAN
—
STEEL TONNAGE
6,000 tons
Project Overview
The CNPC Sixth Construction Cracking Furnace Project is a large petrochemical cracking furnace steel structure project. It includes the cracking furnace main frame, equipment platform and supporting systems. The project uses approximately 6,000 tons of steel.
ZhongSai Steel Structure participated in the manufacturing and supply of steel structural components for this project, including the cracking furnace main frame, equipment platform, supporting systems and connecting components. The project uses approximately 6,000 tons of steel, and all components are factory prefabricated according to design drawings.
Project Gallery
ZhongSai Supply Scope
Main Structural Components
Factory prefabrication of steel columns, steel beams, welded H-sections, box columns and other main structural components.
Secondary Structural Systems
Processing and supply of purlins, wall girts, bracing systems, connecting components and other secondary structural members.
Enclosure System Materials
Roof panels, wall panels, skylights, gutters, trims and other enclosure system supporting materials.
Planning a Similar Petrochemical & Energy Project?
Have drawings or BOQ? Send them to us for professional quotation and technical support.
Send Project Requirements