Products Solutions Components Projects About 中文 Get a Quote
← Back to All Projects

DOMESTIC PROJECT / 国内案例

CNPC Sixth Construction Cracking Furnace Project

Guangdong · Steel Structure Project · Steel Tonnage: 6,000 tons

CONSTRUCTION AREA

—

BUILDING HEIGHT

—

SPAN

—

STEEL TONNAGE

6,000 tons

Project Overview

The CNPC Sixth Construction Cracking Furnace Project is a large petrochemical cracking furnace steel structure project. It includes the cracking furnace main frame, equipment platform and supporting systems. The project uses approximately 6,000 tons of steel.

ZhongSai Steel Structure participated in the manufacturing and supply of steel structural components for this project, including the cracking furnace main frame, equipment platform, supporting systems and connecting components. The project uses approximately 6,000 tons of steel, and all components are factory prefabricated according to design drawings.

Project Gallery

CNPC Sixth Construction Cracking Furnace - Project aerial view
CNPC Sixth Construction Cracking Furnace - Construction site
CNPC Sixth Construction Cracking Furnace - Equipment detail
CNPC Sixth Construction Cracking Furnace - Installation view

ZhongSai Supply Scope

Main Structural Components

Factory prefabrication of steel columns, steel beams, welded H-sections, box columns and other main structural components.

Secondary Structural Systems

Processing and supply of purlins, wall girts, bracing systems, connecting components and other secondary structural members.

Enclosure System Materials

Roof panels, wall panels, skylights, gutters, trims and other enclosure system supporting materials.

Planning a Similar Petrochemical & Energy Project?

Have drawings or BOQ? Send them to us for professional quotation and technical support.

Send Project Requirements