Industrial Warehouse — Dubai, UAE
← Back to All Projects
迪拜钢结构工业仓库物流建筑项目

Industrial Warehouse — Dubai, UAE

📍 Dubai, UAE 📐 6,Available upon request 🏗️ Available upon request 📅 2025
📦 Project Note: This project was supplied by ZhongSai Steel Structure with design, manufacturing and export services. On-site installation was completed by the client's local construction team, with detailed drawings and technical support provided by us.

Project Specifications

Country
United Arab Emirates
City
Dubai
Building Type
Industrial Warehouse
Total Area
6,Available upon request
Steel Tonnage
Available upon request
Production Period
30 days
Design Standard
AISC 360 / BS 5950 + Dubai Municipality Code
Wind Load
0.75 kN/m² (high wind zone)
Steel Grade
Q355B (equivalent to ASTM A572 Grade 50)

Project Overview

Industrial warehouse in Dubai, UAE, with insulated sandwich panels, high wind resistance design, meeting DM standards. ZhongSai provides complete design, production, ASTM certification and export to Jebel Ali Port.

Production & Export

🏭 Production
30 days (Dongguan & Huizhou factories)
📦 Container Loading
Multiple 40HQ containers
🚢 Shipping Route
Shenzhen → Jebel Ali Port
⏱️ Transit Time
18-22 days by sea

Installation Support

We provide detailed installation drawings, bolt lists, video tutorials, and WhatsApp/WeChat online technical support. For first-time installation teams, we can dispatch engineers overseas for installation guidance. We provide installation technical guidance only and do not undertake on-site construction.

Frequently Asked Questions

What certifications are required for industrial warehouses in Dubai?

Industrial buildings in Dubai typically require DM (Dubai Municipality) approved drawings and construction permits, with steel required to meet ASTM or BS standards. ZhongSai provides material certificates compliant with ASTM A36/A992 standards, factory inspection reports, and welding procedure specifications (WPS/PQR) to assist clients with the DM approval process.

How is insulation designed for extreme high temperatures?

Dubai summer temperatures can reach above 50°C. This project uses 100mm thick polyurethane insulated sandwich panels (PIR) with thermal conductivity ≤0.022W/m·K, and a ventilated air gap layer on the roof to reduce solar radiation heat. Light-colored coatings on walls reflect sunlight, combined with ridge ventilators and louvers to achieve natural ventilation cooling.

How is wind and sand resistance designed for desert areas?

Dubai basic wind pressure is designed at 0.75kN/m², classified as a strong wind zone. Doors and windows use double-layer sealing strips, waterproof breathable membranes are added at roof laps, and sand baffles are designed at eaves. Steel structure surfaces use a three-coat anti-corrosion system of zinc-rich epoxy primer + polyurethane topcoat, with salt spray corrosion resistance ≥1000 hours, adapting to the high-salt, high-humidity environment of the Gulf region.

How long does customs clearance take at Jebel Ali Port?

Sea freight from Shenzhen to Jebel Ali Port takes approximately 18-22 days, and customs clearance after arrival typically takes 3-7 days. Dubai has efficient customs clearance. We recommend clients prepare import permits and EWR (Electronic Waybill Receipt) in advance. ZhongSai provides complete packing lists, commercial invoices, certificates of origin (CO), and material certificates to ensure fast customs clearance.