Heavy Mining Equipment Workshop with 30-ton Crane — Lima, Peru
← Back to All Projects
秘鲁矿山车间钢结构矿业厂房项目

Heavy Mining Equipment Workshop with 30-ton Crane — Lima, Peru

📍 Lima, Peru 📐 3,Available upon request 🏗️ Available upon request 📅 2025
📦 Project Note: This project was supplied by ZhongSai Steel Structure for design, manufacturing, and export only. On-site installation was completed by the client local construction team with our detailed drawings and technical support.

Project Specifications

Country
Peru
City
Lima
Building Type
Heavy Mining Equipment Workshop with 30-ton Crane
Total Area
3,Available upon request
Steel Tonnage
Available upon request
Production Cycle
26 days
Design Standard
AISC 360 + ASCE 7 + Peruvian Technical Standards (E.060)
Wind Load
0.40 kN/m² (Lima coastal exposure, low seismic but high humidity)
Steel Grade
Q355B (equivalent to ASTM A572 Grade 50)

Project Overview

A heavy-duty mining equipment maintenance workshop in Lima, Peru, equipped with a 30-ton overhead crane. The project featured coastal anti-corrosion design for Lima humid climate, heavy equipment foundation integration, and specialized workshop layout for mining machinery repair. ZhongSai provided complete design, manufacturing, and export to Callao Port, Lima.

Production & Export

🏭 Production
26 days (Dongguan & Huizhou factories)
📦 Container Loading
7 x 40HQ containers
🚢 Shipping Route
Shenzhen → Callao Port, Lima
⏱️ Transit Time
35-42 days (via Panama Canal)

Installation Support

English/Spanish installation drawings, AISC-compliant calculation packages, video tutorials, WhatsApp support, and engineer dispatch for heavy crane building installation.

Frequently Asked Questions

What was the biggest challenge for this project?

The 30-ton crane required very precise column alignment and runway beam installation. We provided detailed erection sequences, tolerance specifications (±3mm for column plumb), and pre-assembled crane runway beam sections to minimize on-site adjustment.

How was the coastal corrosion handled?

Lima has high humidity (85%+) despite low rainfall. We specified hot-dip galvanized secondary members, epoxy zinc-rich primer (120 microns) + polyurethane topcoat (60 microns) for primary members, and stainless steel fasteners for all exterior connections.

Did Peru require any special certifications?

Peru uses the Technical Standards for Construction (Normas Técnicas de Edificación). The E.060 standard for steel structures is largely based on AISC 360. We provided complete calculation packages in both English and Spanish, and the local engineer reviewed and stamped them for municipal approval.

How long was the shipping via Panama Canal?

The transit from Shenzhen to Callao via Panama Canal took 35-42 days. We advised the client to book shipping 2 weeks in advance to secure space, as Panama Canal transit slots can be limited during peak season.