Food Processing Plant — Manila, Philippines
← Back to All Projects
菲律宾食品加工厂房钢结构建筑项目

Food Processing Plant — Manila, Philippines

📍 Manila, Philippines 📐 3,Available upon request 🏗️ Available upon request 📅 2025
📦 Project Note: This project was supplied by ZhongSai Steel Structure with design, manufacturing and export services. On-site installation was completed by the client's local construction team, with detailed drawings and technical support provided by us.

Project Specifications

Country
Philippines
City
Manila
Building Type
Food Processing Plant
Total Area
3,Available upon request
Steel Tonnage
Available upon request
Production Period
22 days
Design Standard
AISC 360 / NSF/ANSI + Philippine Building Code
Wind Load
0.85 kN/m² (typhoon exposure)
Steel Grade
Q355B (equivalent to ASTM A572 Grade 50)

Project Overview

Food processing plant in Manila, Philippines, with cleanroom area, insulated sandwich panels, meeting FDA/GMP standards. ZhongSai provides complete design, production, FDA certification and export to Manila Port.

Production & Export

🏭 Production
22 days (Dongguan & Huizhou factories)
📦 Container Loading
Multiple 40HQ containers
🚢 Shipping Route
Shenzhen → Manila Port
⏱️ Transit Time
5-7 days by sea

Installation Support

We provide detailed installation drawings, bolt lists, video tutorials, and WhatsApp/WeChat online technical support. For first-time installation teams, we can dispatch engineers overseas for installation guidance. We provide installation technical guidance only and do not undertake on-site construction.

Frequently Asked Questions

What special requirements apply to food processing plants in the Philippines?

Food processing plants in the Philippines must meet FDA (Food and Drug Administration) hygiene standards and BFAD certification, with cleanroom areas required to meet GMP standards. ZhongSai provides food-grade compliant sandwich panels (rock wool/polyurethane core, double-sided galvanized steel + food-grade coating), and steel structure surfaces use easy-to-clean epoxy topcoat to avoid dust accumulation and bacterial growth, meeting food industry hygiene requirements.

How is cleanroom insulation designed?

This project's cleanroom area uses 100mm thick polyurethane sandwich panels (PIR) with thermal conductivity ≤0.022W/m·K, and 0.5mm thick galvanized steel + food-grade polyester coating on both sides. Wall and roof panels are joined with aluminum alloy profiles, and sealant uses food-grade silicone sealant. Buffer rooms and air showers are installed between clean and non-clean areas to ensure stable temperature, humidity, and cleanliness.

How is wind resistance designed for typhoon-prone areas in the Philippines?

Manila is located on a typhoon path, with basic wind pressure designed at 0.85kN/m² (equivalent to Category 12 typhoon). The structure uses a rigid frame system with rigid column bases and full penetration groove welds at beam-column joints. The roof uses concealed fastening sandwich panels with strong wind uplift resistance. Wind clamps are added at eaves and gables to ensure the roof is not lifted during strong typhoons. Structural calculations consider wind suction, wind pressure, and typhoon eccentric loads.

How long does customs clearance take at Manila Port?

Sea freight from Shenzhen to Manila Port takes approximately 5-7 days, and customs clearance after arrival typically takes 3-7 days. We recommend clients prepare import permits and FDA certification in advance. ZhongSai provides complete packing lists, commercial invoices, certificates of origin (FORM E for tariff preferences), and material certificates to ensure fast customs clearance.